Scrutiny and Approval of Vendor Drawings and accordingly take
care of any impact on technological and building structures and
foundations. In case, any inter-connection of pipes and connections
are left out, the drawings of the same shall prepared by SPET to
make the system complete in all respects
System Integration between different packages to plug any gap
to make the system complete in all respects. This will ensure that
there is no gap in the “Hand-Over Point” and “Take-Over Point”
of different packages
To check Civil drawings and Building Structural drawings for interference
and fouling and providing concurrence
Integration of the Level-1 Automation system engineered by SPET
with the main processes and Balance of Plant